... installed within a week

It usually takes about a week to erect a Börger stainless steel tank.

The cylindrical tank is mounted on the flat surface of the foundation. The procedure begins with the topmost ring of the tank. This is lifted for mounting the next ring.

An unusual but very effective method. Expensive and labor intensive scaffolding is not needed.

The individual segments are bolted on overlapping, one on top of another. The peripheral profiles keep the tank stabilized.

The cylindrical tank wall is mounted on the flat surface of the foundation and secured with the anchoring system. The sealing compound guarantees an optimum, long-lasting seal of the tank.

Simple, solid and permanently sealed.

Filling and discharging terminals on the Börger tanks have a sophisticated design and can be adapted to individual requirements.

1 Safety cover for filling and removal unit
2 Removal pipe (available in NW 150 or NW 200)
3 Sluice gate in the subsurface installation with detachable hand wheel extension
4 Slide unit
5 Underground tank for leaks (pipe drainage)
  • Inlet pressure from tank is utilized
  • Clean shafts
  • Just one small tank (200 l) for leakages