In a municipal wastewater treatment plant in Sweden a pump conveys the raw sludge from the thickener to a digestion tank. Inside the pipes, valves and the pump, repeated blockages occurred caused by rags, toiletries and entanglements. A Multicrusher was installed in the pipeline upstream of the pump to macerate the solids.

There have been no blockages ever since. The customer is surprised about the low noise level. In addition, the Multicrusher does not have to be removed from the pipeline during maintenance. If any damage on one of the blades is noted during the maintenance work performed at regular intervals, it is not necessary to replace the entire blade block. The operator can replace the damaged blade only. Despite the demanding application, the Multicrusher has been operating since 2014 with just one blade change.

Technical data
Macerator
Multicrusher
Medium
Raw sludge
Capacity
7 - 10 m³/h (31 - 44 usgpm)
Solid content
3 - 5 %